Skip to main navigation Skip to main content
KY.gov

An Official Website of the Commonwealth of Kentucky

Kentucky State Seal - Commonwealth of Kentucky: United We Stand. Dividied We FallFinance and Administration Cabinet
  • About
  • Offices
  • Policies
  • Forms
  • Programs
  • Contact Us
  • Press Releases
  • Commonwealth Office of Technology
  • Department for Facilities and Support Services
  • Department of Revenue
  • Office of the Controller
  • Kentucky River Authority
  • Office of the Secretary
  • Office of the Inspector General
  • eProcurement
Staff Login

Technical Guidelines and Specifications

  • Home
  • Department for Facilities and Support Services
  • Office of Facility Development and Efficiency
  • Division of Engineering and Contract Administration
  • Technical Guidelines and Specifications
Main Content

General

00 01 - Table of Contents - Complete Version - Technical Requirements 11-20-1300 01 - Cover - Technical Guidelines and Specifications 10-16-1400 01 - Cover 10-16-1400 02 - Table of Contents - Complete Version - Technical Requirements 12-15-1301 91 13 0 - Contents - Commissioning Technical Requirements 6-22-1301 91 13 1 - Requirements and Guidelines Overview 6-22-1301 91 13 2 - Project Deliverables and Submittal Overview 6-22-1301 91 13 3 - Commissioning Checklist 6-22-13 (PDF)01 91 13 3 - Commissioning Checklist 6-22-13 (WORD)01 91 13 4 - Commissioning Plan Overview 6-22-1301 91 13 5 - Sample Commissioning Plan Outline 6-22-1301 91 13 6 - Owner's Project Requirements Overview 6-22-1301 91 13 7 - Systems Basis of Design Overview 6-22-1301 91 13 7.1 - Systems Basis of Design Workbook Sample 6-22-13 (WORD)01 91 13 7.1 - Systems Basis of Design Workbook Sample 6-22-13 (PDF)01 91 13 8 - Systems Commissioning and Testing Overview 6-22-1301 91 13 9 - Systems Manual Overview 6-22-1301 91 13 9.1 - Sample Systems Manual Table of Contents 6-22-13 (WORD)01 91 13 9.1 - Sample Systems Manual Table of Contents 6-22-13 (PDF)07 00 00 0 - Contents - Roofing Technical Requirements 6-22-1207 00 00 1 - Roofing - General Information 6-22-1307 00 00 2 - Roofing - Low Slope Membrane 6-22-1307 00 00 3 - Roofing - Steep Slope Roofing 6-22-1308 70 00 - Hardware Technical Requirements 3-22-13 (Not yet Published)10 14 00 - Signage Technical Requirements 3-22-13 (Not yet Published)12 00 00 - Workspace Technical Requirements 3-22-13 (Not yet Published)20 00 00 - Owner's Project Requirements All MEP Divisions 21,22,23,25,26,27 6-24-13 (WORD)20 00 00 - Owner's Project Requirements All MEP Divisions 21,22,23,25,26,27 6-24-13 (PDF)

Fire Suppression

21 00 00 1 - Fire Suppression - Design Submittals Checklist 11-20-13 (WORD)21 00 00 1 - Fire Suppression - Design Submittals Checklist 11-20-13 (PDF)21 00 00 2 - Fire Suppression - Owner's Project Requirements 6-24-13 (WORD)21 00 00 2 - Fire Suppression - Owner's Project Requirements 6-24-13 (PDF)21 00 00 3 - Fire Suppression - P&ID Guidelines 3-22-1321 00 00 4 - Fire Suppression - Record Dwgs Guidelines 3-22-13

Plumbing

22 00 00 1 - Plumbing - Design Submittals Checklist 11-20-13 (WORD)22 00 00 1 - Plumbing - Design Submittals Checklist 11-20-13 (PDF)22 00 00 2 - Plumbing - Owners Project Requirements 6-24-13 (WORD)22 00 00 2 - Plumbing - Owners Project Requirements 6-24-13 (PDF)22 00 00 3 - Plumbing - Piping and Instrumentation Diagram Guidelines 3-22-1322 00 00 4 - Plumbing - Record Drawings Guidelines 6-24-13

HVAC

23 00 00 1 - HVAC - Design Submittals Checklist 11-20-13 (WORD)23 00 00 1 - HVAC - Design Submittals Checklist 11-20-13 (PDF)23 00 00 2 - HVAC - Owners Project Requirements 7-9-13 (WORD)23 00 00 2 - HVAC - Owners Project Requirements 7-9-13 (PDF)23 00 00 3 - HVAC - Energy Savings through Design Practices 6-24-1323 00 00 3.1 - HVAC - Energy Savings Report Example 123 00 00 3.2 - HVAC - Energy Savings Report Example 223 00 00 4 - HVAC - Coal Life-Cycle Analysis 3-22-1323 00 00 5 - HVAC - Piping & Instrumentation Diagram Guidelines 3-22-1323 00 00 6 - HVAC - System Airflow Diagram Guidelines 3-22-1323 00 00 7 - HVAC - Record Drawings Guidelines 3-22-1323 05 93 - HVAC - TAB Guide Specification 8-28-2014 (WORD)23 05 93 - HVAC - TAB Guide Specification 8-28-2014 (PDF)23 28 16 - HVAC - Fume Hoods (not yet published)23 64 14 1 - HVAC - Equipment Pre-Purchase 3-22-1323 64 14 2 - HVAC - Chiller Life-Cycle Procurement 3-22-1323 64 14 3 - HVAC - Sample Guide Specification - Centrifugal Chiller Pre-Purchase 3-22-13 (WORD)23 64 14 3 - HVAC - Sample Guide Specification - Centrifugal Chiller Pre-Purchase 3-22-13 (PDF)23 64 14 4 - HVAC - Sample Guide Specifications - Special Conditions Chiller Pre-Purchase 3-22-13 (WORD)23 64 14 4 - HVAC - Sample Guide Specifications - Special Conditions Chiller Pre-Purchase 3-22-13 (PDF)

Integrated Automation

25 00 00 1 - Integrated Automation - Design Submittals Checklist 11-20-13 (WORD)25 00 00 1 - Integrated Automation - Design Submittals Checklist 11-20-13 (PDF)25 00 00 2 - Integrated Automation - Owners Project Requirements 6-24-13 (WORD)25 00 00 2 - Integrated Automation - Owners Project Requirements 6-24-13 (PDF)25 00 00 3 - Integrated Automation - Energy Savings through Design Practices 6-24-1325 00 00 4 - Integrated Automation - Equipment Pre-Purchase 6-24-1325 00 00 5 - Integrated Automation - (Piping and Instrumentation Diagram) Guidelines 3-22-1325 00 00 6 - Integrated Automation - System Airflow Diagram Guidelines 3-22-1325 00 00 7 - Integrated Automation - Record Drawings Guidelines 3-22-1325 00 00 8 - Integrated Automation - Controls Design Standard and CEMCS Introduction 10-16-1425 00 00 9 - Integrated Automation - CEMCS Points List Spreadsheet 12-4-13

Electrical

26 00 00 1 - Electrical - Design Submittals Checklist 11-20-13 (WORD)26 00 00 1 - Electrical - Design Submittals Checklist 11-20-13 (PDF)26 00 00 2 - Electrical - Owners Project Requirements 6-24-13 (WORD)26 00 00 2 - Electrical - Owners Project Requirements 6-24-13 (PDF)26 00 00 3 - Electrical - Energy Savings through Design Practices 6-24-1326 00 00 4 - Electrical - Equipment Pre-Purchase 06-24-1326 00 00 5 - Electrical - Coal Life-Cycle Analysis 06-24-1326 00 00 6 - Electrical - Record Drawings Guidelines 3-22-13

Communications

27 00 00 1 - Communications - Design Submittals Checklist 11-20-13 (WORD)27 00 00 1 - Communications - Design Submittals Checklist 11-20-13 (PDF)27 00 00 2 - Communications - Owners Project Requirements 6-24-13 (WORD)27 00 00 2 - Communications - Owners Project Requirements 6-24-13 (PDF)27 00 00 3 - Communications - Equipment Pre-Purchase 11-20-1327 00 00 4 - Communications - Energy Savings through Design Practices 6-24-1327 00 00 5 - Communications Record Drawings Guidelines 3-22-13

Electronic Safety & Security

28 00 00 1 - Electronic Safety & Security - Design Submittals Checklist 11-20-13 (WORD)28 00 00 1 - Electronic Safety & Security - Design Submittals Checklist 11-20-13 (PDF)28 00 00 2 - Electronic Safety & Security - Owners Project Requirements 6-24-13 (WORD)28 00 00 2 - Electronic Safety & Security - Owners Project Requirements 6-24-13 (PDF)28 00 00 3 - Electronic Safety & Security - Equipment Pre-Purchase 6-24-1328 00 00 4 - Electronic Safety & Security - Energy Savings through Design Practices 6-24-1328 00 00 5 - Electronic Safety & Security - Record Drawings Guidelines 3-22-13

Storm Water Pollution Prevention Plan

31 25 00 0 - Contents - Storm Water Pollution Prevention Plan 6-22-1331 25 00 1 - SWPPP Technical Requirements 6-22-1331 25 00 2 - SWPPP Guide Specifications 6-22-13 (WORD)31 25 00 2 - SWPPP Guide Specifications 6-22-13 (PDF)31 25 00 3 - SWPPP Operations and Maintenance Guidelines 6-22-1331 25 00 4 - SWPPP BMP Options checklist 6-22-1331 25 00 5 - SWPPP Example Maintenance Log 6-22-1331 25 00 6 - SWPPP Blank Maintenance Log 6-22-1331 25 00 7 - SWPPP BMP - EXAMPLE PLAN 6-22-1331 25 00 8 - SWPPP EPA Stormwater Guide 01-07

In This Section

  • State Planroom
  • Construction Contract Information
  • Capital Construction Project Procedures Manual
  • Technical Guidelines and Specifications

Contact

Kristi SharpStatewide Procurement Branch Manager

Division of Engineering and Contract Administration
1st Floor, Bush Building
403 Wapping Street
Frankfort, KY 40601

Phone
(502) 330-9858

e-mail
Kristi.Sharp@ky.gov

​​

Relative Content

Department for Facilities and Support Services

Offices and Divisions

  • Division of Real Properties
  • Division of Historic Properties
  • Division of Surplus Properties
  • Office of Building and Mechanical Services
  • Office of Facility Development and Efficiency
    • Division of Engineering and Contract Administration
    • Division of Facility Efficiency
Finance and Administration Cabinet

200 Mero Street, 5th Floor
Frankfort, Kentucky 40622

Main Line: (502) 564-4240
Main Fax: (502) 564-6785
Send an Email

Kentucky River Authority Twitter page@ky_finance
Team Kentucky logo

©2025 Commonwealth of Kentucky. All Rights Reserved.

  • Policies
  • Security
  • Disclaimer
  • Accessibility